Hokuriku Shinkansen
You can help expand this article with text translated from the corresponding article in Japanese. (September 2024) Click [show] for important translation instructions.
|
Hokuriku Shinkansen | |||
---|---|---|---|
Overview | |||
Native name | 北陸新幹線 | ||
Status | Operational | ||
Owner | JRTT | ||
Locale | Tokyo, Saitama, Gunma, Nagano, Niigata, Toyama, Ishikawa, and Fukui Prefectures | ||
Termini | |||
Stations | 24 | ||
Color on map |
| ||
Service | |||
Type | High-speed rail (Shinkansen) | ||
System | Shinkansen | ||
Services | Kagayaki, Hakutaka, Tsurugi, Asama | ||
Operator(s) | JR East (from Takasaki to Jōetsumyōkō) JR West (from Jōetsumyōkō to Tsuruga) | ||
Depot(s) | Nagano, Hakusan | ||
Rolling stock | E7 series, W7 series | ||
History | |||
Opened | 1 October 1997 | ||
Last extension | 16 March 2024Tsuruga | , to||
Technical | |||
Line length | 470.6 km (292.4 mi) | ||
Number of tracks | Double-track | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||
Minimum radius | 4,000 m (2.5 mi; 13,000 ft) | ||
Electrification | 25 kV AC, 50/60 Hz (overhead line) | ||
Operating speed | 260 km/h (162 mph), 275 km/h (171 mph) (Between Omiya and Takasaki Stations) | ||
Signalling | Cab signalling | ||
Train protection system | DS-ATC | ||
Maximum incline | 3.0% | ||
|
The Hokuriku Shinkansen (Japanese: 北陸新幹線) is a high-speed Shinkansen railway line connecting Tokyo with Tsuruga in the Hokuriku region of Japan. It is jointly operated by East Japan Railway Company (JR East) and West Japan Railway Company (JR West).
The first section, between Takasaki and Nagano in Nagano Prefecture, opened on 1 October 1997 in time for the 1998 Winter Olympics, and was originally called the Nagano Shinkansen (長野新幹線). The extension to Toyama in Toyama Prefecture and Kanazawa in Ishikawa Prefecture opened on 14 March 2015.[1] Construction of a further section onward to Fukui and Tsuruga in Fukui Prefecture, covering 125 kilometers and six stations, commenced in 2012 and opened on 16 March 2024.[2] The route of the final section to Shin-Osaka was decided on 20 December 2016 as the Osaka–Kyoto route,[3] with construction expected to begin in the late 2020s and take about 25 years, after impact assessment procedures for areas along the line are completed.[4]
Train names and service patterns
[edit]Since March 2015, services on the line are split into four types, with train names as listed below.[5] Trains operate over the Joetsu and Tohoku Shinkansen tracks between Tokyo and Takasaki.
- Kagayaki: Tokyo–Tsuruga, limited-stop service, since 14 March 2015
- Hakutaka: Tokyo–Tsuruga, mostly all-stations service, since 14 March 2015
- Tsurugi: Toyama–Tsuruga, mostly all-stations shuttle service, since 14 March 2015
- Asama: Tokyo–Nagano, mostly all-stations service, corresponding to existing Nagano Shinkansen service introduced in 1997
The original Nagano Shinkansen Asama services, introduced in 1997, replaced the conventional Shin'etsu Main Line limited express services, also named Asama, which previously took 2 hours 50 minutes from Tokyo (Ueno Station) to Nagano. Following the opening of the Shinkansen, part of the conventional line was abandoned between Yokokawa and Karuizawa. This section included the steeply-graded Usui Pass which required the use of bank engines on all trains. Travel time between Tokyo and Tsuruga is 3 hours 8 minutes, 50 minutes shorter than using a conventional train between Kanazawa and Tsuruga.[6]
Stations
[edit]Legend:
● | All trains stop |
---|---|
▲ | Some trains stop |
| | All trains pass |
- The boundary between JR East and JR West lies immediately to the north of Jōetsumyōkō Station.
- Stations in italics are not currently operational.
- ^ a b Although the official terminus of the Ryōmō Line is at Shin-Maebashi and that of the Agatsuma Line is at Shibukawa, trains on both lines run through to Takasaki.
- ^ Although the official terminus of the Iiyama Line is at Toyono, trains on the line run through to Nagano.
Notes
[edit]As of 2024, the maximum line speed is 110 km/h (70 mph) between Tokyo and Ueno, 130 km/h (81 mph) between Ueno and Omiya,[10] 275 km/h (170 mph) between Omiya and Takasaki,[11] and 260 km/h (160 mph) between Takasaki and Tsuruga.[12]
Rolling stock
[edit]- E7 series 12-car "F" sets" (since 15 March 2014)[13]
- W7 series 12-car "W" sets" (since 14 March 2015)
With the start of Nagano Shinkansen services, trains were operated by a new fleet of JR East E2 series 8-car sets. A fleet of 17 new E7 series 12-car trainsets were phased in from March 2014, and these were augmented by a fleet of 10 JR West W7 series 12-car sets introduced from March 2015. The fleet of W7 series was purchased at a cost of ¥32.8 billion.[14] The remaining E2 series trainsets were withdrawn from Hokuriku Shinkansen services on 31 March 2017.[15]
In 2019, ten trains, eight from JR East with a book value of ¥11.8 billion and two from JR West, were damaged when a train yard in Nagano was flooded as the Chikuma River overflowed during typhoon Hagibis.[14][16] As a result, JR West suffered a loss of ¥3 billion (2019) (US$27.52 million).[16]
Former rolling stock
[edit]- E2 series 8-car "N" sets on Tokyo - Nagano Asama services only
- E2 series 8-car "J" sets
- E4 series 8-car "P50/P80" sets as Max Asama
- 200 series 12-car set F80 during February 1998 only
The original E2 series 8-car "J" sets, primarily used on Tohoku Shinkansen services were also used on some Asama services until they were subsequently lengthened to 10 cars. One specially-modified 200 series set, numbered F80, was used on additional Asama services in February 1998 during the 1998 Winter Olympics held in Nagano. The train was modified to operate on both 25 kV AC 50 Hz and 60 Hz overhead power supplies, incorporated weight-saving measures to comply with the 16 tonne axle load restriction, and included additional control equipment to cope with the 30‰ gradient of the Nagano Shinkansen.[17] Its maximum speed was limited to 210 km/h (130 mph).[17] The last services operated using eight-car E2 series trainsets ran on 31 March 2017, from which date all Asama services were formed of E7 and W7 series trainsets.[18]
-
Nagano Shinkansen E2 series "N" set (Set N11) approaching Tokyo, June 2002
-
Nagano Shinkansen E2 series "J" set (Set J6) approaching Karuizawa, February 1998
-
An E4 series set (Set P14)
-
Modified set F80 on a Nagano Shinkansen Asama service, February 1998
History
[edit]Nagano Shinkansen
[edit]The initial section between Takasaki and Nagano opened on 1 October 1997, in time for the 1998 Winter Olympics in Nagano.
Between May 2012 and March 2014, station platforms on the Nagano Shinkansen had their platform roofs extended to handle the E7 series 12-car trains which entered service in March 2014 ahead of the March 2015 opening of the extension beyond Nagano.[19] The Hokuriku Shinkansen extension from Nagano to Kanazawa opened in March 2015.[19] The 113-km extension from Kanazawa to Tsuruga was approved for construction in June 2012.[20]
From the start of the revised timetable on 15 March 2014, E7 series trainsets were introduced on Asama services.[13] Initially used on seven return services daily, this number was increased to eleven return services daily from 19 April 2014.[13]
Naming
[edit]The line's legal name has always been Hokuriku Shinkansen. However, just before the opening of the Nagano section, JR East has decided that using this name in passenger service is to be avoided. From March 22, 1997, until the extension of the Hokuriku Shinkansen to Kanazawa, the primary route for Hokuriku customers (from the Tokyo area) is to use the Joetsu Shinkansen to Echigo-Yuzawa Station, then transfer to Hakutaka via the Hokuetsu Express, rendering using the Takasaki–Nagano section of the Hokuriku Shinkansen meaningless for them. Therefore, JR East sought other names.[21]
On the other hand, local governments in Hokuriku, fearing construction west of Nagano may be halted, petitioned that the name "Hokuriku" should remain in use for operational purposes. [22]
JR East announced the following solution at July 25, 1997:[23]
- Voice announcements using "Nagano Shinkansen"
- Tokyo area stations using depictions with "Nagano-bound Shinkansen".
- Stations between Annaka-Haruna Station and Nagano Station depicting "Shinkansen" only.
Soon, "Nagano-bound Shinkansen" fell out of use, and timetables by various publishers use "Nagano Shinkansen" only.[24] Construction to Kanazawa was officially decided, thereby reducing the opposition to the name.
Extension beyond Nagano
[edit]Construction of the extension from Nagano to Kanazawa was completed on 24 May 2014.[25] When services commenced in March 2015, the travel time from Tokyo to Toyama was reduced to about 2 hours, with Kanazawa an additional 30 minutes away.[25] Final permission to start construction to Fukui was granted in December 2011, with modification works to Fukui Station already in progress for several years in anticipation of the extension.[26] The extension to Tsuruga was approved for construction on 30 June 2012,[27] and opened on 16 March 2024.[28] Beyond Jōetsumyōkō Station, the line is operated by West Japan Railway Company (JR West) instead of East Japan Railway Company (JR East).[29]
Naming issue rises again
[edit]Many people speculated about and discussed what the line's operational name should be after Nagano–Kanazawa section is completed.
Nagano economic associations argued a sudden change in name will confuse customers, propose "Nagano–Hokuriku Shinkansen" to be used.[30] In contrast government officials and economic associations in Hokuriku region defended the legal name, including statements such as "a just result should come after 3 prefectures striving for 40 years".[31][32][33]
Section west of Jōetsumyōkō belongs to JR West, which did not state an opinion and used "Hokuriku Shinkansen" only.[34]
On October 2, 2013, JR East announced formal line name will be Hokuriku Shinkansen (consistent with National Shinkansen Railway Development Act) and depicted as Hokuriku Shinkansen (via Nagano) to reflect its expansion into the region, resolving the naming issue.[35]
Test-running
[edit]Test-running on the JR East section of the line between Nagano and Kurobe-Unazukionsen commenced on 1 December 2013, initially at low speeds using the "East i" test train.[36] From 6 December, test-running commenced using 10-car E2 series trainsets, with running speeds gradually increased to the full line speed of 260 km/h (160 mph).[36] Test-running continued until the end of March 2014.[36] Test-running on the entire line between Nagano and Kanazawa (Hakusan Depot) started on 1 August 2014, using the "East i" test train.[37] Test-running using W7 series trains commenced on 5 August 2014, initially at low speed, on the JR West section between Kanazawa and Jōetsumyōkō.[38]
Tsuruga extension
[edit]In the months preceding the opening, JR West conducted various low speed runs on the new Kanazawa-Tsuruga section using "East i" test trains on 23 September 2023.[39] Runs using regular W7 series trainsets started on 26 September.[39] Regular passenger service began on 16 March 2024, with ceremonies at both Tsuruga and Tōkyō from the respective presidents of JR West and JR East.[40] The extension cost ¥1.67 trillion (US$15.22 billion) to build.[41]
In accordance with the opening of the extension, the limited express service Thunderbird ended its service between Tsuruga and Kanazawa on 15 March 2024.[42]
Future plans
[edit]The route of the final section from Tsuruga to Ōsaka was finalized on 20 December 2016 as the Obama–Kyoto route.[3] JRTT proposed three possible stations in Kyoto at an August 8, 2024 meeting.[43] Two options include a new station underground near Kyoto Station. The third option is a newly constructed station near Katsuragawa Station, also underground. The route extension is estimated to cost up to 5.3 trillion yen and require up to 28 years to complete construction.[44]
Including the Obama-Kyoto route, the following four options were under consideration before the December 2016 announcement,[45] with a fifth unofficial option suggested by a local politician.[46]
- Maibara Route (米原ルート): This involved building a full standard shinkansen track to Maibara Station. The proposal was one third of the length of the Obama Route, and provided good access to both Kyoto and Nagoya. However, a severe drawback was that it would have resulted in longer travel time to Osaka than the other options and trains would have had to use the existing, already heavily congested Tokaido Shinkansen tracks between Maibara and Shin-Osaka.
- Kosei Route (湖西ルート): This involved no new track construction; instead, this proposal would have upgraded the Kosei Line to Kyōto, either by regauging or dual-gauging the line to support Mini-Shinkansen, or alternatively utilizing Gauge Change Train (GCT) operations. This was the cheapest option, but meant train speeds would likely be limited to a maximum of 160 km/h (100 mph) and hence travel times would have been longer than the other options.
- Obama Route (小浜ルート): First proposed in 1973,[45] this route involved building a full standard shinkansen track via Obama and Kameoka. It was the shortest route to Osaka, but also the most expensive (approximately 1 trillion yen), and would have bypassed Kyōto.
- Obama–Kyoto Route (小浜・京都ルート): This, the now selected route, was first made public in August 2015, and involves following the proposed Obama Route west as far as Obama and then building shinkansen track southward to link with the Tokaido Shinkansen at Kyōto. Including Kyoto on the route is seen as important to increase tourism.[45]
- Maizuru Route (舞鶴ルート): Kyoto politician, Shoji Nishida's proposal from Tsuruga, via Obama, to Maizuru then south-east to Kyoto City, southern Osaka City, and Kansai International Airport.[46] This option did not have a price estimated, but would have likely been the most expensive due to the scale of the proposal. Its case was to provide development to the Maizuru region as per the Japanese national government's policy, with the Maizuru Maritime Self-Defence Force Base and several nuclear power stations put forward as reasonable traffic generators. The option to extend the line south of Kyoto to a new Osaka station (Tennōji, located in the south east of Osaka City) was seen as a means to avoid the congestion of the Tokaido line. It may have served as an alternative route or terminus to Shin-Osaka station for Tokaido line trains, reducing Tokaido line congestion.
A government committee deliberating the proposals decided in April 2016 to narrow the proposed route to three alignments between Tsuruga and Kyōto and two alignments between Kyoto and Shin-Ōsaka (a northern route through Minoh and a southern route through the Kansai Science City). On 6 March 2017 the government committee announced the chosen route from Kyoto to Shin-Osaka is to be via Kyotanabe, with a station at Matsuiyamate on the Katamachi Line.[47][48] There are also requests from Kyoto City and Kyoto Prefecture, local governments along the route, to further extend the line to Kansai Airport.[49][50]
Interim plans
[edit]In an attempt to extend the benefits of the Hokuriku Shinkansen to stations west of Tsuruga before the section to Shin-Osaka is completed, JR West was working in partnership with Talgo on the development of a Gauge Change Train (GCT), which was proposed to be capable of operating under both the 25 kV AC electrification used on the Shinkansen and the 1.5 kV DC system employed on conventional lines. The six-car train was due to start trials on the Hokuriku Shinkansen and the 1067 mm-gauge Hokuriku and Kosei lines in 2017. As part of the project JR West had begun trials with a purpose-built 180 m-long gauge-changer at Tsuruga.[51] However, as a result of the abandonment of the proposed use of a GCT on the West Kyushu Shinkansen to Nagasaki by JR Kyushu, in August 2018 JR West announced that the proposed GCT between Tsuruga and Osaka had been abandoned.[52]
Conventional lines running parallel to the Hokuriku Shinkansen
[edit]With the opening of the initial Nagano Shinkansen section in October 1997, the section of the conventional (narrow gauge) Shinetsu Main Line running along approximately the same route between Karuizawa and Shinonoi was transferred from the control of JR East to a newly established third-sector railway operating company, Shinano Railway, becoming the Shinano Railway Line.
With the opening of the Hokuriku Shinkansen extension north of Nagano on 14 March 2015, the conventional lines running along approximately the same route were transferred from the control of their respective JR owning companies to newly established third-sector railway operating companies funded primarily by the prefectural and municipal governments through which the lines pass. A total of 252.2 km (156.7 mi) of route between Nagano and Kanazawa was transferred to four separate operating companies, including 75.0 km (46.6 mi) of the Shinetsu Main Line between Nagano and Naoetsu, and 177.2 km (110.1 mi) of the Hokuriku Main Line between Naoetsu and Kanazawa.[53] Details of the five third-sector operating companies and their respective lines are as shown below.[53]
In 2019, it was decided that the section of the Hokuriku Main Line between Tsuruga and Fukui would be transferred to third-sector railway operating companies.[54] Three years later in 2022, it was determined that the section would be split among two operators. The IR Ishikawa Railway would extend their operations from Kanazawa to Daishoji,[55] while a new company, Hapi-Line Fukui,[56] established during the preparation phase, would take over the section between Daishoji and Tsuruga. Hapi-Line Fukui is expected to overtake the 84.3 km (52.4 mi) section of the Hokuriku Main Line effective the 16 March 2024 timetable revision.[57]
Former line name | Former operating company | Date transferred | Section | Length (km) | New line name | Operating company |
---|---|---|---|---|---|---|
Shinetsu Main Line | JR East | 1 October 1997 | Karuizawa–Shinonoi | 65.1 | Shinano Railway Line | Shinano Railway |
14 March 2015 | Nagano–Myōkō-Kōgen | 37.3 | Shinano Railway Kita-Shinano Line | |||
Myōkō-Kōgen–Naoetsu | 37.7 | Myōkō Haneuma Line | Echigo Tokimeki Railway | |||
Hokuriku Main Line | JR West | Naoetsu–Ichiburi | 59.3 | Nihonkai Hisui Line | ||
Ichiburi–Kurikara | 100.1 | Ainokaze Toyama Railway Line | Ainokaze Toyama Railway | |||
Kurikara–Kanazawa | 17.8 | IR Ishikawa Railway Line | IR Ishikawa Railway | |||
16 March 2024[2] | Kanazawa–Daishōji | 46.4 | ||||
Daishōji–Tsuruga | 84.3 | Hapi-Line Fukui Line | Hapi-Line Fukui |
References
[edit]- ^ "Kanazawa to Tsuruga extension of the Hokuriku Shinkansen opens". Railway Gazette International. 18 March 2024. Retrieved 11 August 2024.
- ^ a b "北陸新幹線 金沢—敦賀間の開業日が2024年3月16日に決定 〜運行計画の概要を発表〜" [Hokuriku Shinkansen Extension to Tsuruga to Open on 16 March 2024]. Japan Railfan Magazine Online (in Japanese). 30 August 2023. Archived from the original on 30 August 2023. Retrieved 30 August 2023.
- ^ a b "Hokuriku extension route agreed". Railway Gazette. London. 23 December 2016. Archived from the original on 24 November 2020. Retrieved 23 March 2018.
- ^ Railway Bureau, MLIT; JRTT (August 2024). 北陸新幹線(敦賀・新大阪間)詳細駅位置・ルート図(案)ご説明資料 [Hokuriku Shinkansen (Tsuruga/Shin-Osaka) Detailed Station Locations and Route Map (Draft) Explanatory Material] (PDF). 北陸新幹線事業推進調査に関する連絡会議 [Liaison Conference on Hokuriku Shinkansen Project Promotion Survey] (in Japanese). pp. 5–6. Retrieved 11 August 2024.
- ^ 北陸新幹線 長野~金沢間開業に伴う運行計画の概要について [Outline of service plans for opening of Hokuriku Shinkansen from Nagano to Kanazawa] (PDF) (Press release) (in Japanese). Japan: JR East & JR West. 27 August 2014. Retrieved 27 August 2014.
- ^ 北陸新幹線「金沢―敦賀」延伸、地元が期待「100年に一度」のチャンス [Extension of Hokuriku Shinkansen "Kanazawa - Tsuruga", the opportunity of "once every 100 years" expected by locals] (in Japanese). Japan: Newswitch. 16 March 2024. Retrieved 16 March 2024.
- ^ About a new station name
- ^ "Document on Primary Environment Impact Consideration (May 2019)" (PDF) (in Japanese). Japan Railway Construction, Transport and Technology Agency.
- ^ a b According to the materials (PDF) (in Japanese)<published by Japan Railway Construction, Transport and Technology Agency>, the stations are going to be installed around Higashi-Obama Station and Matsuiyamate Station.
- ^ "The Tohoku Shinkansen: Full Speed Ahead - Japan Railway Journal | NHK WORLD-JAPAN". NHK WORLD. Retrieved 25 March 2024.
- ^ "JR東日本、上越新幹線が最高275km/hに - 北陸新幹線も所要時間短縮". マイナビニュース (in Japanese). 25 December 2022. Retrieved 25 March 2024.
- ^ "300km/hのトップランナー" [300 km/h Top Runners]. Japan Railfan Magazine. Vol. 52, no. 612. Japan: Kōyūsha Co., Ltd. April 2012. p. 14.
- ^ a b c 3月15日ダイヤ改正と各地の話題 [15 March timetable revision and topics from around the regions]. Tetsudō Daiya Jōhō Magazine (in Japanese). Vol. 43, no. 361. Japan: Kōtsū Shimbun. May 2014. p. 12.
- ^ a b "Ten Hokuriku Shinkansen Line trains worth ¥32.8 billion sustain damage after yard is flooded in Typhoon Hagibis". The Japan Times Online. 13 October 2019. Archived from the original on 22 October 2019. Retrieved 7 November 2019.
- ^ 北陸新幹線「E2系」今月引退…五輪輸送で活躍 [Hokuriku Shinkansen E2 series to be withdrawn this month - Played an active role in transportation during the Olympics]. Yomiuri Online (in Japanese). Japan: The Yomiuri Shimbun. 21 March 2017. Archived from the original on 21 March 2017. Retrieved 22 March 2017.
- ^ a b "All 10 typhoon-flooded shinkansen bullet trains to be scrapped". Kyodo News+. Retrieved 7 November 2019.
- ^ a b 200系F80編成 [200 series set F80]. Japan Railfan Magazine. Vol. 38, no. 444. Japan: Koyusha Co., Ltd. April 1998. p. 64.
- ^ E2系N編成“あさま”の営業運転終了 [E2 series N set Asama services end]. Japan Railfan Magazine Online (in Japanese). Japan: Koyusha Co., Ltd. 1 April 2017. Archived from the original on 1 April 2017. Retrieved 3 April 2017.
- ^ a b Ito, Tadayuki (3 May 2012). 新幹線ホーム屋根延長へ 長野県内各駅、金沢延伸に備え [Nagano Prefecture shinkansen station platforms to have roofs extended in preparation for extension to Kanazawa]. The Asahi Shimbun Digital (in Japanese). Japan: The Asahi Shimbun Company. Archived from the original on 12 May 2012. Retrieved 3 May 2012.
- ^ Kyodo News, "Bullet-train extensions approved", The Japan Times, 30 June 2012, p. 2
- ^ 「北陸新幹線・東京-長野 10月開業を発表 列車愛称『あさま』」『信濃毎日新聞』 [Hokuriku Shinkansen Tokyo-Nagano will open October]. Shinano Daily News, Apr 16 1997 (in Japanese).
- ^ 「呼称は長野か北陸か新幹線揺れる―JR東日本『まだ長野まで』北陸自治体『名前は残して』」『日本経済新聞』1997年5月5日
- ^ 「北陸新幹線ダイヤを発表 長野まで最速79分 しなの鉄道2割増」『信濃毎日新聞』1997年7月26日
- ^ JTB時刻表 時刻表80年のあゆみ-第3回- - JTB Publishing るるぶ.com
- ^ a b Igata, Katsuhiro (25 May 2014). "Hokuriku Shinkansen line between Nagano, Kanazawa completed". ajw.asahi.com. Asahi Shimbun. Archived from the original on 28 May 2014. Retrieved 27 May 2014.
- ^ [1] Archived 5 January 2012 at the Wayback Machine
- ^ "Shinkansen to get 3 new sections : National : DAILY YOMIURI ONLINE (The Daily Yomiuri)". www.yomiuri.co.jp. Archived from the original on 7 July 2012. Retrieved 2 February 2022.
- ^ "The Shinkansen: Japan's Bullet Train". 16 September 2022.
- ^ Kyodo News, "DPJ may OK three new bullet-train sections", The Japan Times, 17 December 2011, p. 1.
- ^ "北陸新幹線:名称は「長野北陸新幹線」に 県商工会議所連合会らJRに要望/長野". 毎日新聞. 毎日新聞社. 17 March 2009. Retrieved 17 March 2009.[permanent dead link ]
- ^ "新幹線あくまで「北陸」 知事 「3県で40年努力した」". Chunichi ShimbunTomaya ver. Chunichi Shimbun Company. 20 February 2013. Archived from the original on 22 February 2013. Retrieved 20 February 2013.
- ^ "新幹線 堂々と「北陸に」 谷本知事「乗客が誤解する」". Hokuriku Chunichi Shimbun. Chunichi Shimbun Hokuriku branch. 21 February 2013. Retrieved 21 February 2013.[permanent dead link ]
- ^ "問答無用「北陸」で当然". 北陸中日新聞. 中日新聞北陸本社. 2 March 2013. Archived from the original on 5 March 2013. Retrieved 2 March 2013.
- ^ "北陸新幹線用の新型車両について" (Press release). JR West. 4 September 2012. Retrieved 12 November 2014.
- ^ Wong, Maggie Hiufu (22 December 2023). "New bullet train route makes it easier than ever to visit Japan's stunning Hokuriku region". CNN. Retrieved 14 June 2024.
In 2015, the line was extended and renamed Hokuriku Shinkansen to reflect its expansion into the region, with the tracks making their way through Niigata and Toyama prefectures – the later famed f
- ^ a b c 北陸新幹線、12月1日から走行試験 [Hokuriku Shinkansen test running to start from 1 December]. Webun (in Japanese). Japan: The Kitanippon Shimbun. 5 October 2013. Archived from the original on 8 October 2013. Retrieved 9 October 2013.
- ^ E926形"East-i"が金沢(白山総合車両所)まで走行試験 [Class E926 "East i" test run to Kanazawa (Hakusan Depot)]. Tetsudo Hobidas (in Japanese). Japan: Neko Publishing. 4 August 2014. Archived from the original on 15 July 2018. Retrieved 5 August 2014.
- ^ 北陸新幹線金沢~上越妙高間でW7系による走行試験が始まる [Test-running using W7 series begins on Hokuriku Shinkansen between Kanazawa and Jōetsumyōkō]. Tetsudo Hobidas (in Japanese). Japan: Neko Publishing. 5 August 2014. Archived from the original on 7 August 2017. Retrieved 5 August 2014.
- ^ a b "Test run starts on extended line of Hokuriku Shinkansen". Yoshito Asakura. 26 September 2023. Retrieved 15 March 2024.
- ^ "New bullet train extension comes into service". NHK. 16 March 2024. Retrieved 16 March 2024.
- ^ "New bullet train extension comes into service". NHK WORLD. 15 March 2024. Retrieved 20 March 2024.
- ^ “さよなら北陸本線” サンダーバードも金沢-敦賀間の運行終了 ["Goodbye Hokuriku Main Line" Thunderbird also ends operation between Kanazawa and Tsuruga] (in Japanese). Japan: NHK. 15 March 2024. Retrieved 15 March 2024.
- ^ "Hokuriku Shinkansen (Tsuruga/Shin-Osaka) Detailed station locations and route map (draft)" (in Japanese). Japan Railway Construction, Transport and Technology Agency.
- ^ Johnston, Eric (8 August 2024). "Hokuriku Shinkansen extension to come with ballooning costs". Japan Times Online. Retrieved 8 August 2024.
- ^ a b c 北陸新幹線延伸「小浜・京都ルート」も検討 JR西日本 [JR West also considering Obama-Kyoto route for Hokuriku Shinkansen extension]. Asahi Shimbun Digital (in Japanese). Japan: The Asahi Shimbun Company. 29 August 2015. Retrieved 29 August 2015.
- ^ a b Johnston, Eric (24 January 2016). "Politics heating up over Hokuriku Shinkansen Line's undecided last leg". Japan Times Online. Retrieved 23 March 2018.
- ^ お知らせ : 京都新聞. www.kyoto-np.co.jp. Kyoto News. Archived from the original on 7 March 2017. Retrieved 23 March 2018.
- ^ 北陸新幹線“京田辺市ルート”最終調整へ|日テレNEWS24. news24.jp. Retrieved 23 March 2018.
- ^ 北陸新幹線(敦賀以西ルート)の早期整備と、京都駅に接続するルート及び関西国際空港への延伸の実現 [Early development of Hokuriku Shinkansen (route west of Tsuruga) and realization of a route connecting to Kyoto Station and extension to Kansai International Airport] (PDF). City of Kyoto. 2016. Retrieved 14 September 2024.
- ^ 北陸新幹線(敦賀~新大阪)の整備 [Construction of Hokuriku Shinkansen (Tsuruga to Shin-Osaka)]. City of Kyoto. 8 April 2024. Retrieved 14 September 2024.
- ^ "Talks begin on Hokuriku Shinkansen extension". 7 August 2015.
- ^ "北陸新幹線にフリーゲージ断念へ政府、与党とJR西日本" [Abandon free gauge on the Hokuriku Shinkansen Government, ruling party and JR West]. Fukui Shimbun (in Japanese). 25 August 2018. Archived from the original on 4 September 2019. Retrieved 17 February 2021.
- ^ a b Osano, Kagetoshi (March 2015). 北陸新幹線並行在来線各社の姿 [Guide to companies operating conventional lines alongside the Hokuriku Shinkansen]. Tetsudō Daiya Jōhō Magazine (in Japanese). Vol. 44, no. 371. Japan: Kōtsū Shimbun. pp. 28–33.
- ^ "新幹線並行在来線の準備会社発足" [Establishment of a New Third Sector Company created to take over conventional line running parallel to the Shinkansen]. Fukui Shimbun ONLINE (in Japanese). 14 August 2019. Archived from the original on 1 September 2019. Retrieved 3 February 2024.
- ^ "福井県並行在来線準備株式会社鉄道線の鉄道事業再構築実施計画の認定について". Ministry of Land, Infrastructure, Transport and Tourism (in Japanese). 19 January 2022. Archived from the original on 11 September 2023. Retrieved 3 February 2024.
- ^ "新社名「株式会社ハピラインふくい」に変更しました" [The new company name has been changed to "Hapi Line Fukui Co., Ltd."]. hapi-line.co.jp (in Japanese). 4 July 2022. Archived from the original on 16 December 2023. Retrieved 3 February 2024.
- ^ "並行在来線「ハピラインふくい」も3月16日開業" [Parallel conventional line “Happi Line Fukui” will also open on March 16th]. Chunichi Shimbun Web (in Japanese). 31 August 2023. Archived from the original on 4 February 2024. Retrieved 4 February 2024.
External links
[edit]- JR East website (in Japanese)
- JR West website (in Japanese)
- Ishikawa Prefecture: Hokuriku Shinkansen construction page (in Japanese)
- Fukui Prefecture: Hokuriku Shinkansen Construction Promotion Division (in Japanese)